India’s second-largest hydropower project, the 2,000 MW Subansiri Lower Hydroelectric Project (SLHEP), is in the final stages of construction at Gerukamukh on the Arunachal Pradesh and Assam border. Out of the five 9.5-meter diameter diversion tunnels of the SLHEP, the only diversion tunnel being used was closed due to a landslide at 11:30 am on […]
Author Archives: Biswajit Basu
Biswajit Basu is Director (Projects) at NHPC Ltd